EEC/11/35/HQ
Cabinet
9 March 2011
Devon and Torbay Local Transport Plan 2011-2026: Implementation Plan for Devon and Proposed 2011/12 Programme
Report of the Executive Director of Environment, Economy and Culture
Recommendation: It is recommended that the:
(a) Local Transport Plan Implementation Plan for 2011 to 2026 for Devon is approved;
(b) 2011/12 Local Transport Plan Integrated Block and On-Street Parking Account programmes are approved;
(c) Executive Director of Environment, Economy and Culture is given delegated authority to vary the 2011/12 LTP programme as required.
1. Summary
This report introduces the LTP Implementation Plan for approval alongside the detailed programme for the first year.
2. Background/Introduction
The 2011 to 2026 Local Transport Plan for Devon and Torbay comprises two main documents, the Strategy and the Implementation Plan. The joint strategy document for Devon and Torbay was approved by Cabinet at the 9 February 2011 meeting and subsequently by Full Council at its meeting on 17 February (report EEC/11/25/HQ refers). Torbay Council's Cabinet and Full Council also approved the strategy document at the 24 and 25 February meetings respectively.
The Implementation Plan explains how the strategy will be implemented in practice over the life of the Plan. Devon and Torbay have produced separate Implementation Plans to ensure responsive and flexible programmes. Torbay's Implementation Plan was approved by its Cabinet and Full Council at the same meetings as the Strategy document.
The initial Implementation Plan for Devon attached with this report sets out the proposed programme of transport schemes and services from all capital and revenue funding sources over the next five years. The detailed programme approvals are set out in a series of separate reports to Cabinet:
2011/12 to 2015/16 Capital Programme (Medium Term Financial Strategy - Corporate funding) approved by Cabinet at the 9 February 2011 meeting and full Council on 17 February;
2011/12 revenue budgets approved by Cabinet at 9 February meeting and full Council on 17 February;
2011/12 LTP Integrated Block and On-Street Car Parking Account programme included in this report;
2011/12 County Roads Highway Maintenance Revenue Budget separate report being considered at this meeting;
2011/12 Highway Structural Maintenance and Bridge Assessment and Strengthening separate report being considered at this meeting.
Table 1:
Summary of Projected Capital Funding Sources to Deliver the Local Transport Plan 2011/12 to 2015/16
,000 | 2011/12 | 2012/13 | 2013/14 | 2014/15 |
LTP Integrated Block allocation | 4,106 | 4,380 | 4,380 | 6,159 |
Corporate capital (Transport Schemes) (1) | 9,218 | 8,998 | 8,090 | 6,161 |
On-street car parking account | Some capital schemes are funded from this account. Please see Appendix IV for details.
| |||
Other external sources | These sources vary significantly year by year and it is not possible to accurately predict future levels on an annual basis. They include developer contributions and bids such as the Local Sustainable Transport Fund.
| |||
DfT Major Scheme Funding (2) | 8,823 | 6,604 | 25,000 | 25,000 |
Highway Maintenance including Bridges | 36,833 | 35,123 | 33,415 | 31,467 |
Total | 58,980 | 55,105 | 70,885 | 68,787 |
3. Proposal
The LTP Implementation Plan for Devon
Previous LTPs have essentially been bidding documents for Government funds. The funding programmes focussed solely on the capital funds awarded for maintenance and new schemes from the Government's LTP funds. In practice transport spending across Devon and Torbay has been significantly higher than this, particularly when corporate capital, developer contributions and revenue spending on areas such as road maintenance and bus services are taken into account. The third LTP from 2011 takes a more holistic view of transport funding priorities and investment and better reflects the scope of future investment.
The Implementation Plan for Devon reflects the focus of the LTP Strategy in providing the conditions for economic growth and reducing the generation of carbon. This provides a strong linkage with the planning for future housing and employment infrastructure in District Council Local Development Frameworks. These will be key drivers for future economic growth and it is essential that the right transport infrastructure is in place at the right time. The Implementation Plan provides a good opportunity to do this but it must be sufficiently flexible to respond to changing circumstances, proposals and market conditions. Flexibility is also required to reflect the changing funding and policy landscape since the election of the Coalition Government.
The scale of change to a wide range of policies may also be significant with the emerging focus on localism and the Big Society. This has particularly affected the planning system and its close relationship with transport with new proposals such as neighbourhood plans and the proposed revocation of Regional Spatial Strategies.
2011/12 Integrated Block Programme
The total level of Integrated Block funding for 2011/12 is 4.106m. This has been split into five programmes and includes an element of over programming to manage scheme slippage. The five programmes are:
| Foundation ,000 | Targeted Capital Investments ,000 | Total ,000 |
Exeter (Appendix I) | 920 | 600 | 1,520 |
Market and Coastal Towns and Rural Devon (Appendix II) | 1,748 | 515 | 2,263 |
Countywide (Appendix III) | 580 |
| 580 |
Total (including over programming) | 4,363 |
The Foundation programmes are essential requirements for the LTP strategy. They focus on facilitating changes to travel behaviour and ensuring the transport network operates efficiently using low cost and high value traffic management measures and capital interventions.
The delivery of Targeted Capital Investments is subject to additional capital funding sources being available at the necessary time. They must have strong outcomes for the economy, environment and society. They will typically be linked to employment and housing growth plans in Local Development Frameworks (LDFs) to support the priorities of economic growth and carbon reduction. It is proposed that the Integrated Block funding in 2011/12 is used to support early design and consultation work on these schemes, particularly where this is required to progress them through the appropriate LDF inquiry stages. Early pump priming is the County Council's contribution to LDF infrastructure development by achieving the necessary design and approval processes in advance of full scheme funding, the majority of which will be from developer contributions.
The table below sets out the general form of the final programme and Appendix I lists the proposed schemes. Prioritisation has been carried out on the basis of the overall objectives in the LTP3 strategy. It should be noted that the level of Integrated Block funding available has been significantly reduced through the Comprehensive Spending Review (by about 50%), so the type and scale of improvement programmes operated previously are not now possible.
| Foundation | Targeted Capital Investments |
Exeter (Appendix I) | - Completion of A377 Alphington Cross improvement - Traffic management and bus priority on main corridors - Station improvements as part of the Exerail programme - Improvements to walking and cycling routes - Casualty and Severity Reduction Schemes (Appendix III) | - Access to the City Centre (scheme preparation for Alphington Interchange Park and Ride, Devon Metro and City Centre growth) - East of Exeter (Scheme preparation for bus priority, Cranbrook rail station) - Major developments (Scheme preparation for infrastructure to serve growth areas at Monkerton, Newcourt and South West) |
Market and Coastal Towns and Rural Devon (Appendix II) | - Casualty Reduction Schemes - Local schemes (Appendix II) - Betton Way, Moretonhampsted - Scheme supporting tourism and leisure including public rights of way, multi-purpose walking and cycling routes and design and planning for Park and Change sites serving the Jurassic Coast | Design and planning of infrastructure to serve LDF led economic and housing growth over the next 15 years |
Countywide (Appendix III) | - Development of public transport smartcard system for Devon - Intelligent Transport Systems - Supporting employers and schools to provide smarter travel choices - Commitments for completed major schemes - Completion of 2010/11 schemes - Monitoring |
|
On Street Parking Account
Income from on-street pay and display parking is used to support parking management and any surplus must by law be used for transport purposes.
The proposed On Street Parking Account programme for 2011/12 is shown in Appendix IV. This funds new parking and traffic management schemes and supplements public transport revenue funding and other accessibility schemes once operational costs have been deducted. Potential new pay and display parking schemes in market and coastal towns will be considered as part of comprehensive traffic and parking plans to be developed from April 2011 onwards. Funding has been set aside in the 2011/12 On Street Parking Account programme to support the development of parking schemes arising from these plans.
4. Consultations/Representations/Technical Data
A separate LTP Consultation Report has been produced that sets out the consultation process and responses in detail. This is available on request or from the County Council's website. The Cabinet report for the LTP Strategy considered at the 9 February meeting included a summary of the feedback and the County Council's responses. Overall the feedback from stakeholders and the public was very positive.
A draft Implementation Plan for Devon was included in the consultation process. Detailed consultation was carried out with key partners to ensure that they could support the plan and ensure an integrated approach to delivery. The Implementation Plan was strongly supported by delivery partners and key stakeholders.
This report has already noted the need for flexibility to respond to changing circumstances over a 15 year period. The Plan will be reviewed approximately every five years and this will include opportunities to consult on the performance to date and any changes required to the remainder of the Plan.
5. Financial Considerations
The Local Transport Plan is delivered with the support of a number of funding sources over the fifteen year period. The Government has confirmed the funding for the LTP integrated and maintenance blocks for the next four years subject to minor changes resulting from reviews to calculation formulas. This is now provided as grant rather than mixture of grant and borrowing approvals. This releases the County Council's borrowing power for other proposals, such as its contributions to major schemes. It also offers the opportunity to plan schemes more effectively over the period subject to the Cabinet's agreement in parallel with the MTFS. A proposed programme for the three years of Integrated Block funding 2012/13 to 2014/15 will be brought to a Cabinet meeting at a later date.
This report sets out the proposed programme for the Integrated Block and On Street Parking Account for the 2011/12 financial year. The Integrated Block programme includes an allowance for over programming to manage any spillage in scheme delivery. The income level for the On Street Parking Account is based upon previous years and income from new pay and display schemes. If this is projected to fall below the stated level the programme will be managed accordingly to deliver a balanced budget.
6. Sustainability Considerations
A Strategic Environmental Assessment has been carried out on the Local Transport Plan as a whole. This demonstrated that the plan showed positive economic, social and environmental benefits. The initial 2011/12 programme has been developed by testing the benefits of individual schemes to ensure that they make as great as possible contributions to these. The Health Impact Assessment demonstrated that the plan made particularly strong contributions to improved health through the provision of new and improved rural and urban cycle and walking routes.
Future infrastructure to support LDF related development is one part of a larger picture that should deliver sustainable development in individual communities across Devon. The infrastructure proposals being developed support this objective and will be tested for sustainability through the LDF inquiry process.
7. Carbon Impact Considerations
Carbon reduction is one of the key priorities for the LTP alongside economic growth. This will be particularly important in the context of the expected economic growth including new housing and transport plays a major role. There is a particular focus on reducing the large number of short car trips in Exeter and other towns which make a major contribution to carbon emissions.
The Implementation Plan includes investment to improve people's transport choices and flexibility of travel. This includes alternative options such as the cycle network in Exeter, Park and Ride, more efficient networks which reduce carbon emissions (including priority lanes for buses and other vehicles and traffic management), and more flexible use of the car including car sharing, car clubs and eco-driving.
8. Equality Considerations
A combined Equalities Impact Needs Assessment and Health Impact Assessment has been carried out on the LTP as a whole. This demonstrated that there were no significant negative impacts on different groups and that much of the investment, for example in multi use walking and cycling routes, would prove beneficial to a wide range of groups. Other measures such as investment in bus priority, real time information and smartcards also contributed to reduced inequalities.
9. Legal Considerations
The production of the LTP meets the legislative requirements of the Local Transport Act 2000 as amended by the 2008 act.
10. Risk Management Considerations
The development of the 2011/12 programmes has included an analysis of delivery risk. This ensures that the programmes are realistic and deliverable. They include an element of over programming to manage any delays to scheme implementation. The programmes will be closely monitored throughout the financial year and amendments made as required.
The Implementation Plan will be regularly reviewed to ensure that it reflects current funding opportunities and government policy. Annual programmes will be developed from it.
11. Options/Alternatives
Both the Implementation Plan and the detailed 2011/12 programmes have been developed by testing them against the priorities identified in the LTP Strategy document. Individual schemes will be assessed for value for money and the support of and contribution from delivery partners.
12. Reason for Recommendation/Conclusion
The LTP Implementation Plan and detailed 2011/12 programme are a positive basis from which to deliver local economic growth and carbon reduction whilst also providing good value for money in a period of constrained resources. The Implementation Plan will, alongside the Strategy document, also enable Devon to influence key future decisions at the local and national levels and generate new investment opportunities from the private and public sectors.
Chris McCarthy
Electoral Divisions: All
Cabinet Member for Highways and Transportation,
Councillor Stuart Hughes
Local Government Act 1972: List of Background Papers
Contact for enquiries: Andrew Ardley
Room No. AB3, Lucombe House, County Hall, Exeter
Tel No: (01392) 383528
Background Paper | Date | File Ref | |
|
|
|
|
1. | LTP Consultation Report | January 2011 |
|
aa180211cba
hak/cr/ dtltp 2011
06 hq 280211
Appendix I
To EEC/11/35/HQ
Table 1a: Local Transport Plan 2011/12 - Integrated Block Foundation Programme for Exeter
Programme | Scheme Details | Stage | Budget ,000 |
Walking & Cycling | Key walking and cycle routes | Design/ Implementation | 250 |
Rail | Rail station improvements | Implementation | 150 |
Highways | Traffic management schemes on corridors and Heavy Goods Vehicle (HGV) routeing | Implementation | 152 |
| Alphington Cross improvement | Implementation | 270 |
Forward Design and over programming |
| Design | 50 |
|
| First year Economic Rate of Return (ERR) |
|
Casualty and Severity Reduction | B3212 Pinhoe Road/Summer Lane - changes to pedestrian crossing and loading area | 1140% | 15 |
Casualty and Severity Reduction | A379 Bridge Road - vehicle actuated signing | 304% | 25 |
Casualty and Severity Reduction | B3212 Pinhoe Road - loading restrictions and improved signal heads | 633% | 8 |
|
|
|
|
| Total | 920 |
Table 1b: Local Transport Plan 2011/12 - Integrated Block Targeted Capital Investments Programme for Exeter
Programme | Scheme Details | Stage | Budget ,000 |
Access to City Centre | Development of Alphington Interchange Park & Ride, Devon Metro, City Centre regeneration | Design | 200 |
East of Exeter | Development of Junction 29 Major Scheme, bus priority access to Cranbrook and Cranbrook rail station | Design | 200 |
Major Developments | Development of infrastructure to serve urban extensions at Monkerton, Newcourt and South West Exeter | Design | 200 |
| Total | 600 |
Appendix II
To EEC/11/35/HQ
Table 2a:
Local Transport Plan 2011/12 Integrated Block Programme for Market and Coastal Towns and Rural Devon (Overview)
Programme | Scheme Details | Stage | Budget ,000 |
Foundation Programme | |||
Local Schemes | See Table 2b | Implementation | 461 |
Casualty and Severity Reduction Schemes | See Table 2c | Implementation | 387 |
Tourism and Leisure | Jurassic Coast, Public Rights of Way (PROW), Bere Alston Tavistock cycle route, rural cycle routes | Implementation | 350 |
Moretonhampsted Betton Way | Provides a link between Court Street and the A382 at Chagford Cross as part the Forder Meadow housing development and the new primary school | Implementation | 450 |
Forward Design and over programming |
| Design | 100 |
| Foundation Programme Sub Total | 1,748 | |
Targeted Capital Investments | |||
LDF infrastructure scheme assessment and development | Including Dinan Way, Exmouth; Cullompton Eastern Distributor Road; M5 Junctions 27/28; Tiverton Link to A361; Tiverton Heathcoat Way connection; Totnes traffic management; Langage Deep Lane junction; Tavistock Bere Alston rail link; Okehampton Link Road; A39/A361 junctions (North Devon & Torridge); Newton Abbot town centre and Kingsteignton; Drumbridges junction and links to Newton Abbot | Design | 515 |
| Targeted Capital Improvements Sub Total | 515 | |
Total | 2,263 |
Appendix II
To EEC/11/35/HQ
Table 2b:
Local Transport Plan 2011/12 Integrated Block Programme for Market and Coastal Towns and Rural Devon: Local Schemes
Location | Scheme description/ outcome | Estimated cost ( ,000) |
A361 Braunton village centre | Signalisation redesign to maximise capacity and reduce congestion in air quality management area | 45 |
East Devon Upton Pyne | Provide new bus stop & shelter with raised kerbs | 5 |
B3226 South Molton South Street | Improved pedestrian crossing for school and local pedestrian demands
| 28 |
West Devon (Annual Rolling Programme) | Bus infrastructure improvements to promote bus travel and assist existing users
|
15 |
South Hams (Annual Rolling Programme) | Bus infrastructure improvements to promote bus travel and assist existing users
| 30 |
Teignmouth Town centre | Bus infrastructure improvements to promote bus travel and assist existing users | 15 |
Ilfracombe Marlborough Road | New bus shelter at Fowlers Holiday Park to encourage bus use | 5 |
Exmouth Dinan Way | New footway links from bus stops across the grass verges to improve access to local bus services | 8 |
Newton Poppleford High Street | Realign bus kerbs and bus stop clearway markings into road to reduce delays to buses and reinstate use of lay-by for motorists to access local convenience store | 3 |
A388 Frithlestockstone village centre | New bus shelter to encourage bus use | 3 |
C822 Lifton Fore Street | Localised footpath widening to improve accessibility
| 18 |
Sampford Chapple village centre | New bus shelter and short footpath link to encourage bus use | 5 |
A388 Saltrens village centre | New bus shelter to encourage bus use
| 4 |
Uffculme Commercial Road | Priority system with length of missing link footway to improve pedestrian facilities on main HGV route through village | 45 |
Ivybridge Cornwood Road | New section of cycle lane on NCN 2. Improved cycle facility and road narrowing to reduce speeds on known Speed Complaint Action Review Forum (SCARF) site | 17 |
South Brent | New section of cycle lane on NCN 2. Improved cycle facility and road narrowing to reduce speeds on known SCARF site | 17 |
Barnstaple and surrounding urban areas | Essential replacement of primary urban bus shelter sites not maintained since contract expired 2008 | 8 |
East Devon NCN 2 | Off road multi use path at Trow Hill, and on road sections of the NCN route through East Devon appropriately and informatively signed
|
45 |
Newton Abbot Union St | Forward design of street scene enhancements to improve town centre environment | 15 |
Teignmouth Town centre |
Dropped kerbs for pedestrians to cross highway. Improve accessibility for mobility impaired
| 20 |
A386 Churchill Way | New Footpath Link. Improves walking routes promotes sustainable travel to local facilities
|
45 |
Beer Old Beer Hill | Multi use path. Improved linkage between Seaton, Beer and the PROW network
| 65 |
|
Total (including an element of design & over programming) |
461 |
Reserve schemes
| ||
B3227 Umberleigh | New pedestrian link and crossing. Improves walking routes promotes sustainable travel to local facilities | 39 |
A386 Torrington Station Hill | Off road cycle link (phase 1) between Town Centre and Tarka Trail. Improves leisure and commuter links to NCN | 35 |
Clyst Honiton Old A30 | Pedestrian Refuge provides a better crossing point of the old A30
| 15 |
Chudleigh Street Market | Traffic Regulation Order to allow street market to take place
| 3 |
|
Total | 92 |
Appendix II
To EEC/11/35/HQ
Table 2c:
Local Transport Plan 2011/12 Integrated Block Programme for Market and Coastal Towns and Rural Devon: Casualty and Severity Reduction Schemes
Road No | Scheme location/ description | Estimated cost ,000 | First Year Economic Rate of Return |
A381 | Newton Abbot to Teignmouth Route Study - signing and lining | 20 | 1050% |
A386 | Route Study - Yelverton to Plymouth signing | 15 | 693% |
C794 | Route Study - Avonwick to Totnes - improve signing and lining | 25 | 572% |
A379 | Route Study - Yealmpton to Modbury - improve signing and lining | 35 | 463% |
B3227 | Route Study - Chittlehampton to Umberleigh - signing lining and surface treatments. | 15 | 462% |
A381 | Route Study - Halwell to Totnes - improve signing and lining | 20 | 380% |
B3181 | Cullompton - High Street - zebra crossing | 30 | 285% |
UC | Barnstaple Boutport St/Bear St/Queen St - signing, lining, TROs, and traffic calming | 70 | 271% |
C783 | Filleigh - vehicle actuated signing | 24 | 238% |
A386 | Grenofen high friction surfacing and signing | 8 | 271% |
B3174 | Ottery St Mary - Mill Street - inset parking offset along road | 30 | 190% |
B3212 | Route Study - Moretonhampstead to Warren House Inn - signing and lining route | 30 | 190% |
UC | Exmouth - Imperial Road/St. Andrews Road - build outs and pedestrian facilities | 35 | 163% |
A39 | Barnstaple - Pilton Bridge - Separate Right Turn | 20 | 173% |
sub total | 377 |
| |
| Forward Design | 10 |
|
Total |
387 |
|
Appendix III
To EEC/11/35/HQ
Local Transport Plan 2011/12 Integrated Block Programme: Countywide Foundation
Scheme Type | Scheme Detail | Stage | Cost ( ,000) |
Smarter Travel | Smartcard scheme development | Implementation | 155 |
| Intelligent Transport Systems | Implementation | 20 |
| Smarter Travel employers and schools | Implementation | 50 |
| Park and Change | Design | 40 |
Commitments | Major schemes | Implementation | 200 |
| Retentions and contingency | Implementation | 100 |
| Monitoring | Implementation | 15 |
|
| Total | 580 |
Appendix IV
To EEC/11/35/HQ
On Street Parking Account 2011/12
On Street Parking Account 2011/12 | Scheme Cost ( ,000)
|
On Street Parking Pay & Display Schemes |
|
Introduction of new and review of existing schemes (to be developed through traffic and parking plans for individual towns) | 100 |
Parking Enforcement Equipment/systems (including improved mobile equipment for enforcement officers) | 100 |
|
|
Traffic Management Schemes |
|
Signs and lines | 150 |
Parking reviews & implementation of recommendations | 150 |
Speed management speedwatch/vehicle activated signs | 100 |
Sub total | 600 |
|
|
Public/Sustainable Transport Initiatives |
|
Exeter area public transport continuation following end of S106 agreements | 200 |
Ilfracombe Park & Ride support | 9 |
Barnstaple Park & Ride Support and Promotion | 140 |
Exeter to Barnstaple Rail service support (Tarka Line) | 75 |
Dartmoor railway service support | 70 |
Bus services supporting access to employment | 49 |
Accessibility services, including Wheels to Work, Ring & Ride, Accessibility Priority Action Areas, Shopmobility
| 190 |
Sub Total | 733 |
Total | 1,333 |